(431) 334-6658info@mazesecurity.ca
WORK / PROOF
REPORT 01 · Diamond Mine · Northwest Territories

Winter-road gate control during a 90-day rotation window.

A tier-one diamond operator was losing hours at the winter-road gate during peak February throughput. We rebuilt gate discipline around the barcode manifest — and the closures stopped.

Winter-road gate control during a 90-day rotation window.
SECTOR
Diamond Mine
LOCATION
Lac de Gras corridor, NT
DURATION
3 winter rotations
DISCLOSURE
Anonymized · NDA
The Problem

A tier-one NT diamond operator faced repeated D&A screening gaps at the winter-road gate during peak February throughput — every hour of gate closure meant a $28,000 line-haul demurrage.

The Deployment

Maple embedded a two-guard rotation with a supervising Level-2 officer, rebuilt the sign-in flow around the barcode manifest, and stood up a redundant satellite radio backhaul to camp dispatch.

Measured Outcomes
0
Gate closures / month
down from 4.2
100%
D&A screening rate
sustained across rotation
$182K
Demurrage avoided
in the first quarter

“Out here the gate is the whole ballgame. They treated it that way from the first shift.”

Site Services Superintendent · Northern diamond operation

Post-deployment report anonymized under NDA. Every Maze Security contract carries a non-disclosure clause — client identities are never published. Figures verified during internal review.

DIRECT

Facing something similar?

One call. A regional supervisor answers.